[01]Planning Intelligence

See What Your Schedule Is Really Telling You

Transform Primavera P6 schedules into actionable insights with AI-driven analytics, DCMA compliance scoring, and a direct bridge between Level 3 coordination schedules and Level 5 field execution. Purpose-built for FPSO, shipbuilding, and industrial plant construction.

Part of the Konnect xD Ecosystem · Enterprise SSO · Full i18n (EN/中文)

Konnect xD Planning — Project Summary
Konnect xD Planning — Project Summary Dashboard showing S-curve, EVM metrics, DCMA compliance, milestones, WBS progress, and resource distribution
[02]The Industry Problem

The L3 ↔ L5 Disconnect

Planning

The Planner's Office

The main contractor produces a Level 3 coordination schedule in Primavera P6. Engineering and procurement activities are detailed, but construction is high-level — “Install Piping Module 3.”

Construction

The Construction Yard

The construction subcontractor expands this to Level 4/5 — activities down to deck-level, material-type, and diameter ranges. One L3 activity maps to 2,500 trackable work items.

Nobody bridges this gap well:

Granularity mismatch: 1 P6 activity = 500 spools × 5 work steps
Code systems differ: P6 uses WBS codes, construction uses tag numbers
Update frequency mismatch: P6 is monthly, field progress is daily
Weighting differs: P6 uses duration, construction uses manhours

Konnect xD Planning was built to close this gap.

Read the Schedule Intelligence Bridge Article →
[03]Workflow

From Plan to Actionable Intelligence

Step 01
.xer
Upload or Integrate

Upload or Integrate

Drag-and-drop your Primavera P6 .xer file, or connect directly via our native P6 API integration. Instant validation confirms the data is parseable and flags any issues. The system extracts the full project structure — activities, WBS, resources, calendars, and relationships — in seconds.

Step 02
88%DCMA Score
Analyze

Analyze

Automated analytics engines run across your schedule. DCMA 14-Point compliance. Float distribution analysis. Critical path validation. Resource loading heatmaps. Earned Value metrics. AI-driven optimization insights. All computed server-side — no manual setup.

Step 03
1.03SPI
0.98CPI
$2.1BEAC
Act

Act

Explore your schedule through interactive dashboards. Compare versions to track changes. Share compliance reports with stakeholders. Bridge Level 3 plan baselines with Level 5 field progress. Identify risks before they reach the shop floor.

[04]Capabilities

Four Pillars of Planning Intelligence

The Digital Spine

The Digital Spine

Native Primavera P6 XER parsing reconstructs the full project logic — WBS, activities, relationships, resources, and calendars. Snapshot versioning tracks schedule evolution. Compare baselines to detect scope creep and logic drift.

See What The Schedule Hides

See What The Schedule Hides

Automated DCMA 14-Point compliance assessment grades schedule quality across logic density, float distribution, negative lags, and critical path integrity. Earned Value Management tracks CPI and SPI with S-Curve visualization using real schedule data.

Intelligence, Not Just Data

Intelligence, Not Just Data

Server-side AI analyzes your schedule and surfaces optimization recommendations, risk identification, and resource visibility. Powered by Google Gemini — every insight comes with a confidence score so your team knows where to focus first.

Connecting Planners and Builders

Connecting Planners and Builders

Export plan baselines to construction management. Receive quality-gated field progress back. Compute a complete Earned Value picture where BCWP is only earned when work steps are completed and inspections pass. EVM grounded in physical reality, not estimates.

[05]Features

Key Features

Project Health Report — Executive Summary
66HEALTH
Project Health Report
Executive summary based on DCMA 14-point assessment, EVM metrics, and schedule stability analysis.
3/12/2026
43Quality
$84Cost Perf
58Stability
66Resources
⟨⟩87Logic
Performance Dimensions
Multi-axis assessment of project health.
QualityCost PerfStabilityResourcesLogic
Risk Profile
Impact vs Probability Distribution
0High
593Medium
13,510Low Risk
Top 5 Risk Drivers
ACT-STR-3025mediumUpper Deck structural assemblyFLOAT 0d
ACT-MEC-6812mediumModule transportation and loadoutFLOAT 0d
ACT-PIP-3023mediumTransit to field + final hookupFLOAT 0d
ACT-ELE-2018mediumSubstation mobilization and setupFLOAT 0d
ACT-INS-2020mediumPlatform integration (Modules A & B)FLOAT 0d
[06]The Bridge

Level 3 Plan ↔ Level 5 Progress

The Konnect xD ecosystem solves the industry's hardest integration problem: natively interoperating the main contractor's coordination schedule with the subcontractor's field progress via our Construction Management app.

Plan → Construction Management

Export Level 3 baselines, WBS hierarchy, and resource loading directly to kxd-construction apps.
Generate time-phased baseline S-curve for planned vs actual progress tracking.
Sync calendar patterns for accurate work-day calculations in the field.

Construction Management → Plan

Receive physical % complete per mapped activity straight from field tag-level progress.
Quality-gated progress: earned value is only recognized when QA/QC inspections pass.
Actual start/finish dates push back to the schedule for real-time updates.
NCR and punch item status sync as schedule constraint flags.
L3 ↔ L5 Bridge — Quality-Gated EVM
Bridge Active — 4 mappings
Last sync: 8 sec ago
📋L3 Plan Activities
Install Piping Module 342%
Structural Steel — Deck 2100%
E&I Cable Pulling — Area 424%
HVAC Ductwork — Engine Room100%
🏗L5 Field Tags
SP-3001
100%
SP-3002
100%
SP-3003
85%
SP-3004
60%
SP-3005
30%
SS-2001
100%
SS-2002
100%
SS-2003
100%
EI-4001
95%
EI-4002
70%
EI-4003
45%
EI-4004
10%
HV-ER01
100%
HV-ER02
100%
67%Avg Earned Value
2/4Quality Gates Passed
14Total L5 Tags

The key insight: earned value is real when progress is only counted after inspections pass. This is the difference between schedule fiction and construction reality.

[07]Industries

Purpose-Built for Complex Heavy Engineering

FPSO Modules

FPSO Modules

Modular construction yards managing hundreds of concurrent fabrication activities across topsides and hull modules. Where schedule integrity directly impacts sailaway dates and offshore hookup windows.

Shipbuilding

Shipbuilding

Complex vessel programs with interlocking block assembly sequences, outfitting tracks, and system commissioning. Where resource leveling across multiple ships in the same yard is critical.

Industrial Plant

Industrial Plant

Refinery turnarounds, petrochemical expansion, and greenfield EPC projects. Where DCMA compliance and earned value accuracy determine contractor payments and project controls credibility.

[08]Technology

Enterprise-Grade Architecture

Production-ready deployment.

FrontendReact 19 · TypeScript · Tailwind CSS
BackendPython FastAPI · PostgreSQL
AuthMicrosoft Azure SSO (Entra ID)
AIGoogle Gemini
i18nEnglish · 中文
DeployDocker · Azure VM

Ready to See What Your Schedule is Really Telling You?

We're inviting project controls teams to pilot Konnect xD Planning on their own projects. Full access, direct feedback channel, and a seat at the table as we shape the future of Planning Intelligence.